Renewable Energy Sources in the Wisloka River Basin

Projet terminé

Air pollution and emission levels in Southern Poland are substantially higher than in Western European countries, due to the common use of coal for heating purposes. The project aims to improve air quality by introducing renewable energy sources in the Union of the Wisloka River Basin Communes. Solar systems for hot water production will be installed on private and public buildings, and photovoltaic systems for electricity generation will be provided to selected public buildings.

Pays/région Thème Période Budget
Pologne
Protéger l’environnement
Efficacité énergétique et énergies renouvelables
01.09.2010 - 31.03.2017
CHF 18'300'143

Note: the texts under all the headings, with the exception of 'Results achieved', describe the situation before the start of the project.

Contexte

In line with the EU directive on renewable energy, Poland has set itself the goal of increasing renewable energy use to 15% of overall energy consumption.

Objectifs

The project's overall objective is to improve air quality in the project region, which is a protected nature area. The project will reduce emissions caused by coal based heating systems by introducing renewable energy sources in the Wisloka River Basin region. Furthermore, solar power will be used to produce electricity for public buildings.

Groupes cibles

The direct beneficiary of this project is the Union of the Wisloka River Basin Communes as the institution responsible for the implementation of the project, as well as the 4’266 households participating in the project. Indirect beneficiaries are the 243'000 inhabitants of the region due to reduced emission and better air quality which is a result of the shift from coal to renewable energy sources.

Activités
  • Purchase and installation of solar systems for heating water on 105 public buildings.
  • Purchase and installation of solar systems for heating water on 5'950 private households.
  • Purchase and installation of 49 photovoltaic systems on public buildings for generating energy.
  • Campaign to promote the use of renewable energy (conferences, tv spots and promotional movies, trainings sessions, study visits).
  • Installation of equipment for impact monitoring.
Résultats

Résultats obtenus:  

  • 8,250 solar systems on private houses, 103 solar systems on public utility buildings and 49 photovoltaic systems installed.
  • 21,600 Mwh/a solar energy produced per year in participating buildings.
  • Annual CO2 emissions dropped by 10,300 tons


Direction/office fédéral responsable SECO
Crédit Contribution suisse à l'UE élargie
Partenaire de projet Partenaire contractuel
  • National Coordination Unit
  • Polish Ministry of Development

Partenaire de mise en œuvre
Union of Towns and Communes of the Parseta
River Basin

Budget Phase en cours Budget de la Suisse CHF   18'300'143 Budget suisse déjà attribué CHF   18'150'572
Phases du projet Phase 15 01.07.2011 - 31.12.2016   (Completed)

Phase 14 01.09.2010 - 31.03.2017   (Completed)

Phase 12 01.09.2010 - 15.02.2017   (Completed) Phase 11 20.07.2010 - 31.03.2017   (Completed) Phase 10 20.07.2010 - 31.12.2016   (Completed) Phase 9 20.07.2010 - 31.03.2017   (Completed) Phase 6 23.12.2009 - 31.01.2015   (Completed) Phase 4 25.02.2010 - 31.12.2016   (Completed) Phase 3 19.05.2010 - 31.12.2016   (Completed) Phase 2 27.01.2010 - 31.03.2017   (Completed)