Trams for Belgrad

Progetto concluso

The project aims to transport used trams and trailors from Basel to Belgrade and the trams to be taken over and efficiently put into use by the Belgrade Transport Company. Through the project, the service and comfort of public transport users is increased and the Transport Company Belgrade has the necessary rolling stock available to fully serve the tram network in Belgrade. The project enjoys a high visilibity in Belgrade.

The main direct beneficiary of the project is the Belgrade Transport Company GSP and the City of Belgrade.

Paese/Regione Tema Periodo Budget
Serbia
Urban infrastructure and utilities
30.06.2004 - 31.12.2018
CHF  4’437’100
Contesto

Tramways are increasingly recognized as the most efficient and environmentally most friendly public transportation system. The City of Belgrade lacked the necessary funds to purchase new vehicles for its existing tramway system. The donation of second-hand trams, trailers and spare parts by the two Basel transportation companies Basler Verkehrs-Betriebe (BVB) and Baselland Transport (BLT), was a welcome measure to improve public transportation. The project includes the rehabilitation of trams and trailers, their transportation and a range of measures and activities aiming at the improvement of Belgrade City?s public transportation system.

Obiettivi

The donation of BVB and BLT vehicles, thought the financial support of SECO, aims to improve the quality of the transportation services for the citizens of Belgrade, by increasing the number of vehicles and subsequently enabling better frequency of vehicles, since this is one of the most important aspects that contribute to the quality of the public transportation.

The increased number of citizens using public transport contributes to lower pollution in the City.

Effetti a medio termine

As a result of 16 years of cooperation, the Swiss trams make up 1/3 of all GSP?s railway vehicles (a total of 113 vehicles)

The GSP?s tramway transportation efficiency is considerably increased, particularly since the trams from Basel are more reliable and less prone to breakdowns than others. This in turn leads to manifest customer satisfaction improvements

The Belgrade Public Transport Company?s (GSP) tramway passenger capacity is increased by 30%. With the ensuing 60% increase in traffic (measured in km per tramway), this leads to a doubling of the tramway transportation capacity

Donated trams make an average of 916?000km/year, transporting more than seven million citizens/year.

Risultati

Risultati fasi precedenti:  

There have been transports since 2001 with intensive capacity building and training measures to introduce the Swiss trams in Belgrade.


Direzione/Ufficio responsabile SECO
Credito Cooperazione allo sviluppo
Partner del progetto Partner contrattuale
  • City of Belgrade


Budget Fase in corso Budget Svizzera CHF    4’437’100 Budget svizzero attualmente già speso CHF    0 Budget inclusi partner del progetto CHF    4’589’000
Fasi del progetto

Fase 1 30.06.2004 - 31.12.2018   (Completed)