Bundesverwaltung admin.ch
Eidgenössisches Departement für auswärtige Angelegenheiten EDA
Eidgenössisches Departement für Wirtschaft, Bildung und Forschung WBF
Besuchen Sie für länderspezifische Informationen unsere lokalen Erweiterungsbüro-Sites:
 
Renewable Energy Program in the Suski district

In the Suski district, private households account for an important share of environmentally harmful emissions. Some 60% of these emissions stem from coal based devices used by households for heating and domestic hot water production. Through the installation of solar systems, the project aims at improving air quality in valuable nature reserves by reducing emissions from mostly coal based water heating systems of private households and the regional hospital in the Suski district.

Thema / Schwerpunktbereich
Umwelt und Infrastruktur
Basisinfrastruktur: Energieeffizienz und erneuerbare Energien
Zielgruppe
The direct beneficiaries will be the district hospital in Sucha Beskidzka and private households within or in proximity of valuable nature reserves. Indirect beneficiaries are the inhabitants of the wider area.
Kontext
The Suski district is home to an important variety of flora and fauna that is protected by five Natura 2000 sites. Since there are no significant industrial premises located in the region, private households account for an important share of the overall polluting emission in the area. Due to dispersed settlements there are no central heating installations and most households have coal based heating devices.
Ziele
  • Improvement in health and living conditions for the whole population in the covered region
  • Improvement in environmental conditions, especially air quality, in the covered region
Aktivitäten
  • Purchase and installation of complete solar systems for domestic hot water production on more than 2'300 carefully selected residential buildings.
  • Purchase and installation of a complete solar systems for hot water  production in the regional hospital of Sucha Beskidzka.
Ergebnisse
  • Increase of solar energy in the national Polish energy balance.
  • Reduction of conventional fuels used in residential buildings and in the hospital.
  • Reduction of emissions from residential buildings.

Weiterführende Informationen und Dokumente


Interne Links
Externe Links
Artikel und Pressemitteilungen
Projektübersicht
Land:
Polen Polen
Höhe des Schweizer Beitrags:
CHF 4'837'389
Gesamtprojektbudget:
CHF 10'651'269
Datum der Projektgenehmigung:
18.06.2011
Status:
laufend
Verantwortung für die Projektumsetzung:
  • Executing Agency: Sucha Beskidzka Poviat
Schweizer Kontaktstelle:
Projektnummer: UX-01008.03